.walls are a good thing.

{the forms up & ready to pour!}
{poured}
Now with the walls poured, we were ready to spread gravel and lay the radiant heat system.  I guess I should point out that J was the builder, and while most all the work was contracted out, we decided to install the radiant heat ourselves.  Now, I don't mind saying that when we started this process, I was ignorant about all things pertaining to building.  I've never cared to know anything about it, so saying that I was "ignorant," is like the biggest understatement of the year.  I've learned a lot.  A WHOLE lot. :) 